SCDL Assignments : Production and Operation management 8
Select The Blank
Question
An Ideal OC curve is ________
shaped curve that accpets all the lots with quality equal to or better than AQL
.
Correct
Answer Rectangular
Your
Answer Rectangular
True/False
Question
Inspection order is must even for
simple jobs which can be inspected by shop inspector with the tooling available
on shop.
Correct
Answer False
Your
Answer False
Select The Blank
Question
Function concerned with fixation
of time allowed to qualified worker for a job is called ________.
Correct
Answer Work Measurement
Your
Answer Time Measurement
True/False
Question
In case of X bar-R charts,it is
ensured that the assignable causes are detected before the tolerances are
violated, upper and lower statistical limits are worked out and inserted into a
chart.
Correct
Answer True
Your
Answer True
Multiple Choice Single Answer
Question
What is the reason of
fluctuations, if the control chart evaluates that the process is not in a state
of statistical control?
Correct
Answer Assignable
variability
Your
Answer Random variability
Multiple Choice Multiple Answer
Question
Which are different ways to show
critical path in a network?
Correct
Answer Thick Line , Red
Line , Double Line
Your
Answer Thick Line , Red Line ,
Double Line
Select The Blank
Question
OC curve of ideal sampling plan
suggests that all lots less than 3% defectives have the probability of
acceptance of ________.
Correct
Answer One
Your
Answer One
Multiple Choice Single Answer
Question
Process planning is the process of
Correct
Answer establishing
shortest and most economic path of production
Your
Answer establishing shortest
and most economic path of production
Select The Blank
Question
The ________ is a pair of chart
consisting of average chart and range chart placed one below another on a piece
of graph paper.
Correct
Answer X bar-R-chart
Your
Answer X bar-R-chart
Multiple Choice Multiple Answer
Question
Which are the distinct functions
of scientific quality control?
Correct
Answer Acceptance
function , Preventive function , Assurance function
Your
Answer Acceptance function ,
Preventive function , Assurance function
Multiple Choice Multiple Answer
Question
What are the uses of the
instruction manual provided by the manufacturer of a machine?
Correct
Answer It gives
instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting ,
It enlists points, frequency and type of lubrication
Your
Answer It gives instructions
regarding installation and operation of the equipment , It contains note on
common troubles with causes and remedies for troubleshooting , It enlists
points, frequency and type of lubrication
True/False
Question
Cent percent inspection is often
more practical and economical than sampling inspection.
Correct
Answer False
Your
Answer False
Select The Blank
Question
Inspection is represented by
________ during recording for method study.
Correct
Answer Square
Your
Answer Square
Multiple Choice Multiple Answer
Question
What are the benefits of
inspection and quality control?
Correct
Answer Adequate
maintenance of quality , Ensures parts are within specified limits of accuracy
, Gives economy in production through reduction of defective work
Your
Answer Adequate maintenance of
quality , Ensures parts are within specified limits of accuracy , Gives economy
in production through reduction of defective work
Multiple Choice Multiple Answer
Question
Which are the subtasks of the
maintenance phase of the method study?
Correct
Answer Monitoring and
control , Performance appraisal , Audit on savings
Your
Answer Monitoring and control ,
Performance appraisal , Audit on savings
Multiple Choice Single Answer
Question
What is the cause of inherent
variation or internal variation?
Correct
Answer Cumulative
effect of number of chance causes
Your
Answer Worker's efficiency
Multiple Choice Single Answer
Question
What is the meaning of "
Product features" according to J.M.Juran?
Correct
Answer Quality of
design
Your
Answer Quality of design
Select The Blank
Question
REL chart exhibits relationship between
________ of departments in terms of degree of closeness desired.
Correct
Answer Pairs
Your
Answer types
Select The Blank
Question
Principle underlying the Moving
Average mrthod is that future demand shall be ________ past demand.
Correct
Answer Average of
Your
Answer Higher than
Multiple Choice Multiple Answer
Question
Which of the following factors
affect the quality control function?
Correct
Answer Quality of
workmanship , Production aids , Manufacturing facilities
Your
Answer Quality of workmanship ,
Production aids , Manufacturing facilities
Multiple Choice Single Answer
Question
Following is one of the techniques
used for Material Planning for high value material
Correct
Answer MRP
Your
Answer MRP
True/False
Question
Proper care and storage is not an
essential part of a well planned lubrication system.
Correct
Answer False
Your
Answer False
True/False
Question
In case of forward pass
computation, the earliest event time of a plain event equals the earliest event
time of the preceding event plus duration of activity emanating from the preceding
event.
Correct
Answer True
Your
Answer True
Multiple Choice Multiple Answer
Question
Which three of the following are
causes of continuous upward pattern of Xbar-R control chart?
Correct
Answer Wear of tool ,
Abnormal rise in temperature , Accumulation of dirt
Your
Answer Wear of tool , Abnormal
rise in temperature , Accumulation of dirt
Multiple Choice Multiple Answer
Question
Which of the following three
methods used to select the qualified supplier?
Correct
Answer By vendor plant
surveys , By reputation , By experience
Your
Answer By vendor plant surveys
, By reputation , By experience
Multiple Choice Multiple Answer
Question
Which of the following
possibilities can be explored by using flow process chart?
Correct
Answer Eliminating the
operations or combining the operations with another , Reducing the distance
traveled by the workmen or materials , Avoiding the waiting time and thereby
reduce production losses
Your
Answer Eliminating the
operations or combining the operations with another , Reducing the distance
traveled by the workmen or materials , Avoiding the waiting time and thereby
reduce production losses
Select The Blank
Question
The________ is characterised by
manufacture of a several number of a standard product produced and stocked in
the warehouse as finished goods awaiting sales.
Correct
Answer Mass Production
Your
Answer Mass Production
Multiple Choice Single Answer
Question
The ratio of output to input of a
production system is commonly known as
Correct
Answer Productivity
Your
Answer Productivity
Multiple Choice Single Answer
Question
Which is the ideal place to write
a time allotted for an activity in a network?
Correct
Answer Below the arrow
Your
Answer Below the arrow
Multiple Choice Single Answer
Question
Which method of critical path
determination begins with the end event and moves backward to the start event
of the project network?
Correct
Answer Backward pass
computation
Your
Answer Backward pass
computation
Select
The Blank
Question In
a Gantt chart, load can be indicated by numbers or ________.
Correct
Answer Lines
Your
Answer Lines
Multiple
Choice Single Answer
Question What
do you mean by the chart on which the major activities and entry points of
materials are recorded to have graphic view of operations and inspections
involved in the process?
Correct
Answer Operation process chart
Your
Answer Operation process chart
Multiple
Choice Multiple Answer
Question Which
three of the following options can be used to reduce the duration of activity
during project crashing?
Correct
Answer Allocating more manpower and machines than originally planned
for. , Working additional shifts or overtime. , Awarding work to vendors who
charge extra but expedite deliveries.
Your
Answer Allocating more manpower and machines than originally
planned for. , Working additional shifts or overtime. , Awarding work to
vendors who charge extra but expedite deliveries.
Select
The Blank
Question A
shop order in a batch production is accompanied by ________.
Correct
Answer Process sheet
Your
Answer Process sheet
Multiple
Choice Single Answer
Question What
do you mean by the graphical representation of the project which is composed as
series of connected arrows and circles to describe the interrelationship of the
activities involved?
Correct
Answer Network
Your
Answer Network
True/False
Question The
plotting of activities - critical, non-critical and dummy activities- is
strictly according to their precedence relationship.
Correct
Answer True
Your
Answer True
Multiple
Choice Multiple Answer
Question Which
of the following can be subtypes of corrective maintenance?
Correct
Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your
Answer Predictive Maintenance , Design-out Maintenance , Design-in
Maintenance
Multiple
Choice Single Answer
Question Technique
of Value Engineering can be effectively employed in design of a product to
Correct Answer To
meet the intended function at lowest cost
Your
Answer To meet the intended function at lowest cost
Multiple
Choice Multiple Answer
Question How
to exercise control over quality?
Correct Answer Periodical
analysis of inspecting reports to establish causes of rejections , Preperation
of quality standard and specifications , Exercising control over inputs
Your
Answer Periodical analysis of inspecting reports to establish causes
of rejections , Preperation of quality standard and specifications , Exercising
control over inputs
Match
The Following
Question Correct Answer Your Answer
Bottom compartment of control board Bunch of work orders arranged in a sequence in which they are to
be processed. Bunch of work
orders arranged in a sequence in which they are to be processed.
Control board Pictorial
view of machine loading activity Pictorial
view of machine loading activity
Top compartment of control board Work order of item currently being worked on the machine Work order of item currently being worked
on the machine
Middle compartment of control board Work order of item to be processed next on the machine Work order of item to be processed
next on the machine
Select
The Blank
Question In
a control chart, time interval measures the time gap between ________.
Correct
Answer Two consequtive samples
Your
Answer Two consequtive samples
Multiple
Choice Single Answer
Question A
good plant layout helps in
Correct
Answer Reducing handling costs
Your
Answer Reducing handling costs
Select
The Blank
Question Travel
chart represents the quantitative data on material flow by recording distance
and ________ of movements between different pair of departments.
Correct
Answer Frequency
Your
Answer Frequency