SCDL Assignments : Production and Operation management 6

Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops

True/False
Question Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer False

Multiple Choice Multiple Answer
Question Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer
Question Plant location decisions concern following type of organizations
Correct Answer Manufacturing and service organizations
Your Answer Manufacturing and service organizations

Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar

Multiple Choice Multiple Answer
Question Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable

True/False
Question Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer False
Your Answer True

Multiple Choice Multiple Answer
Question Which of the following are activities of corrective maintenance?
Correct Answer Modifications and improvements , Overhauling , Emergency repairs
Your Answer Overhauling , Lubrication as per schedule , Emergency repairs

Multiple Choice Multiple Answer
Question Which of the following observations are expected from the preventive maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play

Multiple Choice Single Answer
Question When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer At the start of the operation

Select The Blank
Question The most commonly used methods employed to determine the critical path in case of large networks are forward pass computation and ________.
Correct Answer Backward path computation
Your Answer Critical path computation

True/False
Question The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Educational , Entertainment , Accomodation

Match The Following
Question Correct Answer Your Answer
Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities. Critical Path Analysis Critical Path Analysis
Two machines & processing time depends on sequence of job loading Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable choice of machines Index Method Index Method
Time relationship between when a product is required and when it can be made available Critical Ratio Scheduling Critical Ratio Scheduling

Select The Blank
Question Duration of each activity is referred to as ________.
Correct Answer Activity time
Your Answer Activity time

Multiple Choice Multiple Answer
Question Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Woolen

True/False
Question Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning.
Correct Answer False
Your Answer True

True/False
Question The operator should not stop production if first piece is not approved by the inspector.
Correct Answer False
Your Answer False

Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines

True/False
Question Cent percent inspection does not mean inspection of component for 100% quality characteristics.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
Question What do you mean by design modifications made to reduce time and effort required in carrying out maintenance work ?
Correct Answer Design-in Maintenance
Your Answer Design-in Maintenance

Multiple Choice Multiple Answer
Question Which of the following are examples of incentives offered by the Central and State Governments for setting up industries in particular locations?
Correct Answer Exemption from excise duty , Soft loans , Subsidy in electrical charges
Your Answer Exemption from excise duty , Soft loans , Subsidy in electrical charges

Select The Blank
Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working

True/False
Question Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer True

Match The Following
Question Correct Answer Your Answer
Bottom compartment of control board Bunch of work orders arranged in a sequence in which they are to be processed. Bunch of work orders arranged in a sequence in which they are to be processed.
Control board Pictorial view of machine loading activity Pictorial view of machine loading activity
Top compartment of control board Work order of item currently being worked on the machine Work order of item currently being worked on the machine
Middle compartment of control board Work order of item to be processed next on the machine Work order of item to be processed next on the machine

Multiple Choice Single Answer
Question Plant Layout decisions are considered to be
Correct Answer Strategic
Your Answer Strategic

Multiple Choice Single Answer
Question What do you mean by the project duration for which the total cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration

Select The Blank
Question A ________ helps to determine the time required by the operator to complete a specified task for the defined method at the defined pace of performance.
Correct Answer Work measurement
Your Answer Work measurement

Select The Blank
Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Correct Answer Rectangular
Your Answer Rectangular

True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.
Correct Answer False
Your Answer False

Select The Blank
Question Function concerned with fixation of time allowed to qualified worker for a job is called ________.
Correct Answer Work Measurement
Your Answer Time Measurement

True/False
Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
Question What is the reason of fluctuations, if the control chart evaluates that the process is not in a state of statistical control?
Correct Answer Assignable variability
Your Answer Random variability

Multiple Choice Multiple Answer
Question Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer Thick Line , Red Line , Double Line

Select The Blank
Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________.
Correct Answer One
Your Answer One

Multiple Choice Single Answer
Question Process planning is the process of
Correct Answer establishing shortest and most economic path of production
Your Answer establishing shortest and most economic path of production

Select The Blank
Question The ________ is a pair of chart consisting of average chart and range chart placed one below another on a piece of graph paper.
Correct Answer X bar-R-chart
Your Answer X bar-R-chart

Multiple Choice Multiple Answer
Question Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer Acceptance function , Preventive function , Assurance function